barajTarnita2

Building the Tarnita-Lapustesti power plant is a green-field investment around Eur 1 billion (without VAT), which will contribute greatly to the economical development of the country and of the area surrounding Cluj-Napoca.

Key figures:
• 1 billion euro (without VAT) – total amount of the investment
• 1000 MW- installed capacity
• 4 pump –turbine x 250 MW/ each- equipment version
• 10 millions mc water- the capacity of the superior accumulation
• Between 5-7 years- the estimated construction period
• Over 4000 jobs will be created